Tripp Lite BP240V135 External 240V Battery Pack for Select 400V 3-Phase SmartOnline UPS Systems

Owner's Manual - Page 4

For BP240V135.

PDF File Manual, 36 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
4
2. Installation and Setup
2.1 Rear Panel View
Note: Inspect the unit before performing installation. Make sure nothing inside the package is damaged. Keep the original packaging for future use.
1
DC Connector: Connects to UPS or a second battery pack.
2
DC Breaker:
Battery over-current protection breaker.
When servicing internal batteries, place the position of the breaker in the “O” position. This breaker does not interrupt DC power
flow between the UPS and any additional battery packs connected in parallel to the UPS. In the event a second battery pack is
connected to the battery bank, the DC voltage from the UPS Bat.+/- will flow through without any interruption to the second battery
bank.
3
Ground Terminals: Connects to earth ground.
2.2 Battery Pack Installation and Setup
Unpacking and Inspection
1. Remove the battery pack from the packaging.
Note: The battery pack is very heavy. Be cautious when unpacking and lifting the unit to avoid injury.
2. Inspect the package contents for impact or other damage:
Battery Pack Unit
Owner’s Manual
Battery Connection Cable
1
3
2
60-pc. Battery Pack
Loading ...
Loading ...
Loading ...