Loading ...
Loading ...
Loading ...
17
Assembly, Operation & Maintenance Instructions
STEP 10
/Place the grills onto the barbeque as shown in the diagrams. Each grill should have a
5-6mm gap around each edge. Each grill will allocate in a groove on a plate support.
STEP 11
/Take the match holder (09) and ๎x into place using a M6.12in (12mm) screw (K), nut M6
(H),
spring washer (D) and ๎at washer (E). Hook the match holder onto the screw (K). The
stand is now complete.
/Connect an approved hose and/or regulator to the inlet manifold (if not already
connected). Put the gas cylinder onto the bottom shelf support R (07) and ๎x in place
by cylinder belt (I). Tighten it by adjusting the cylinder belt (I). Connect regulator to the
gas cylinder/bottle and leak test (as per the gas connections instructions). Check all hose
connections are tight, and that ll control knobs are o๎ before turning on the gas supply
and leak testing.
Loading ...
Loading ...
Loading ...