Loading ...
Loading ...
Loading ...
17
Assembly, Operation & Maintenance Instructions
STEP 10
/Place the grills onto the barbeque as shown in the diagrams. Each grill should have a
5-6mm gap around each edge. Each grill will allocate in a groove on a plate support.
STEP 11
/Take the match holder (09) and ๎˜Ÿx into place using a M6.12in (12mm) screw (K), nut M6
(H),
spring washer (D) and ๎˜žat washer (E). Hook the match holder onto the screw (K). The
stand is now complete.
/Connect an approved hose and/or regulator to the inlet manifold (if not already
connected). Put the gas cylinder onto the bottom shelf support R (07) and ๎˜Ÿx in place
by cylinder belt (I). Tighten it by adjusting the cylinder belt (I). Connect regulator to the
gas cylinder/bottle and leak test (as per the gas connections instructions). Check all hose
connections are tight, and that ll control knobs are o๎˜ before turning on the gas supply
and leak testing.
Loading ...
Loading ...
Loading ...