Loading ...
Loading ...
Loading ...
INSTALL VENT SHIELD
The vent shield is 35-t/8 inches long. Measure from
top of furnace to ceiling. Cut the vent shield to this
dimension less 1/8 inch. Be sure to cut from the top
(end opposite flange) (Fig. 11).
Place vent shield on top of furnace and against the
wall. Drill holes in the furnace top through holes in
vent shield. Fasten to furnace with sheet metal
screws. Screw sides to wall,
install wood trim moulding if desired, if 3/4 inch
quarter round trim is used, trim 1/8 inch from both
side flanges before installing vent shield.
FLANGE
WOOD
TRIM
(NOT FURN|SHED!
IIIIIIIIIIIIIIIIII I II IIIIIIIIIIIIIIIIIIIIIII
I I I llli IIIIIII
Recessed Mount Installation
For ease of installation, servicing and cleaning,
install the furnace at Least four (4) inches above the
floor (Fig. 12).
FIND THE STUDS
Use a stud Iocator or four 8 penny finishing nails.
Repeatedly drive and remove a nail into the wall in
the area of the stud until it is located. Then find one
side. Leave the nail at this location. Drive another
nail just on the other side of the same stud.
Inside edge of the other stud should be about 14-1/2
inches from the one found. Drive finishing nail on
inside edge of this stud.
CUT WALL OPENING
Lay out and cut a 14-3/8" by 74-1/2" opening as
shown in Fig. 12.
WALL LAYOUT
I
14-I/2"
STUDS
/\
!
74-I/2"
t
I
i
| i 4_
" : L RECOMA_ENDtEO
F J_.'iM.' H. iHJHJ'i , 11
I
i LL Ill :
9
\
Loading ...
Loading ...
Loading ...