GE - General Electric DDC4500SQMWH GE gas dryer

User Manual - Page 5

For DDC4500SQMWH.

PDF File Manual, 6 pages, Download pdf file

Loading ...
Loading ...
Loading ...
EXHAUST INFORMATION (continued)
FOR LEFT SIDE EXHAUST
Never use flexible duct inside dryer
Straighten up the tab inside the exhaust duct at the back of
appliance (see figure on pg. 4), then remove the internaI duct
connected to the blower housing.
Cut as shown to remove 8Wls' from the duct and reconnect it to
the blower housing. Make sure that the tab opening is at the
bottom of the duct.
To secure the duct, insert the tab (located on the appliance
base) in the opening and bend it
Detach and remove the knockout on the left side panel.
Use a standard and adjustable metal elbow and a metal straight
duct to exhaust the dryer through the knockout.
Use only 4" diameter rigid metallic duct 43/4_ i_
Cover the opening at the back with the plate provided installed
on the back of the appliance L
PARTS AVAILABLE FROM LOCAL SERVICE ORGANIZATION
Rigid Metal Duct Components
WX8X63 4" x 1 Duct
WX8X64 4" x 2 Duct
WX8X51 4 Eibow
WX8X59 4" Aluminum hood
Flexible Metal Duct Components
Kit WX8X66 7 Aluminum duct
4" aluminum hood and two clamps
WX8X65 7 Aluminum flexible duct
WX8X58 4 Clamps (2)
F__ 8 3/1, -=4
I JL
'_ SAVE THIS
_\. '- _PORTION
CUT HERE
BLOWER
_[[ HOUSI NG EXHAUST
///-DUCT
BEND TAB IN
I I <--THIS
p I DIRECT ON
BASE OF/ ZTA B
DRYER
REAR OF
/DRYER
"\-- BLOWER HOUSING
_!INSTALL
THE _-'REW- THE PLATE
OPENING SUPPLIED
MINIMUM CLEARANCES
Minimum clearances are - 0 both sides
1 at rear
88" vertical space from floor to ceiling
Loading ...