FLUSH INSTALLATION INSTRUCTIONS
4. BACK FRAME INSTALLATION: Position BACK FRAME
equal space top to bottom, side to side. Mark for 4 holes
on the installed wood cleats, center punch and pre-
drill the cabinet with
1
16" drill bit. Secure frame with 4
SCREWS E. See Figure 7.
Equal gap top, bottom
Equal gap
side to side
Mounting holes
Mounting holes
Mounting holes
Mounting holes
Screw E
Screw E
Screw E
Screw E
Figure 7
5. Install AIR DEFLECTORS top and bottom. Center (left
and right) the AIR DEFLECTORS above and below the
installed BACK FRAME. Secure AIR DEFLECTORS with
4 SCREWS E. See Figure 8. Mark holes and pre-drill the
wood cleats with
1
16" drill bit.
Figure 8
6. FRONT FRAME INSTALLATION: Place the FRONT
FRAME onto the BACK FRAME and align ball studs
and receivers. Secure the FRONT FRAME to the BACK
FRAME by rmly pushing the FRONT FRAME onto the
BACK FRAME, engaging the 4 snap attachments. See
Figures 9-10.
Snap
attachment
Figure 9
Figure 10