Soleus WS124E02 Air Conditioner

User Manual - Page 9

For WS124E02. Also, The document are for others Soleus models: WS1-15E-02, WS1-18E-02, WS1-24E-02

PDF File Manual, 19 pages, Read Online | Download pdf file

WS124E02 photo
Loading ...
Loading ...
Loading ...
INSTALLATION
Curtain
Curtain Installation
3. Fasten the curtains to the unit with short screws (Fig.10).
Weather Insulation Board Installation
NOTE: The Weather Insulation Boar d adds an extr a
layer of insulation to keep air from passing through the
sides of the window air conditioner.
1. Using a sharp blade or scissors, slowly cut the
Weather Insulation Board to a size that will fit inside
of the side curtain rails and completely cover the cur-
tain.
2. Once properly sized, remove the backing to expose
the adhesive tape.
3. Place the Weather Insulation Board over the left cur-
tain and firmly press and hold for 5 seconds.
4. Repeat above steps to install the Weather Insulation
Board on right curtain (Fig.11).
Fig. 8
Curtain
Fig. 9
Fig. 10
Fig. 11
Weather Insulation Boards
Fig. 12
Long Screw
Place the Cabinet Inside the Window
1. Set the cabinet in the window so that is centered.
Place the unit so that front edge of the bottom rail
is against the back edge of the sill.
2. Bring the window down so that the front edge of
the top rail is in front of the window. Be sure the
unit is tilting slightly to the outside.
3. Fasten cabinet to window sill using three long
screws. Pre-drill holes if needed. Add the bottom
rail seal over the screws (Fig. 12).
Window
Frame
Top Rail
Bottom Rail
1/4”
1. Attach the top mounting rail to
the unit with short screws (Fig.8).
2. Slide the free end of the curtain into the side panel of the
air conditioner. Do this for each side. The flange for securing
the curtain into the window sill will be facing the room side
when installed (Fig.9).
Top Mounting
Rail
Bottom Rail Seal
Loading ...
Loading ...
Loading ...