The chimney connector must not extend into the
chimney flue.
RIGHT WRONG WRONG
The chimney connector may include a section for a
barometric draft regulator between the furnace and
the chimney. The barometric draft regulator must be
installed in the same room (same pressure zone) as the
furnace.
6" BAROMETRIC
DRAFT REGULATOR
NON COMBUSTIBLE
INSTALLATION PER
NFPA 211
MEASURE FLUE
DRAFT HERE
Install the barometric draft regulator strictly in
accordance with the instructions that are provided
with the barometric draft regulator.
This is a furnace, not a free standing stove. You must
direct heated air from 8" outlets away from the furnace,
or it will not function properly.
1. This installation must be done by a qualified heating
equipment installer.
2. Installation for Supplemental Heat Application to
Existing Central System.
a. Place Coal Burning Furnace so that the chimney
connector will be as short as practical and avoiding
unnecessary sharp turns in the smoke pipe connector
and the installation of devices that would create
excessive resistance to the flow of flue gases.
b. Locate the Coal Burning Furnace as close as practical
to the existing central hot air heating system,
maintaining clearances as stated on the label on the
fuel door.
c. Clearance from combustible materials must comply
with those stated on the label on the side of the
unit. Refer to the clearance table in the front of this
manual. The installation must be made only on a
noncombustible floor.
d. Install the smoke pipe connector to the chimney
with 26-gauge pipe and elbows (to be purchased
separately), maintaining the proper clearances for the
specific model. Seal the smoke pipe in the chimney
with furnace cement. (The chimney connector shall
be securely supported, and joints fastened with sheet
metal screws or rivets.)
e. Install 8" diameter heat pipe to plenum of the central
hot air furnace. Use 26-gauge pipe and connectors (to
be purchased separately). If central air conditioning
is installed in the plenum, install heat pipe above the
air conditioning unit. Secure heat pipe connection
with supports and sheet metal screws.
f. Connect electrical supply in the electrical junction
box that is mounted on the back of the Furnace. See
Wiring Diagram. Remove the cover from electrical
junction box and connect power supply wires to wires
designated, using wire nuts. The power cord supplied
may be used for installation, if permitted by local
codes and regulations. If the power cord supplied
cannot be used, the power supply wiring must be
90 degrees centigrade in a metal cable and should
be completed by a qualified installer complying with
NFPA Standard No. 70 and local codes.