Loading ...
Loading ...
Loading ...
Connecting the Water Supply
(select models)
Materials Needed
'/_" outer diameter flexible copper tubing
Shut-off valve (requires a X" hole to be drilled into
water supply line before valve attachmenO
Adjustable wrench
Y_"hex nut driver
Add 8'
supply
to tubing length needed to reach water
for creation of service loop,
2' diameter
Create service loop with copper
tubing {minimum 2' diamete0.
Avoid kinks in the copper tubing
when bending it into a service
bop,
2. Remove plastic cap from water valve inlet
port.
Place brass nut (A) and sleeve (B)
on copper tube end as illustrated.
Reminder: Do not use an old
sleeve.
Place end of copper tubing into water
valve inlet port. Shape tubing slightly. Do
not kink - so that tubing feeds straight
into inlet port.
5. Slide brass nut over sleeve and screw nut
into inlet port. Tighten nut with wrench.
UMPORTANT: Do not overtighten. Cross
threading may occur.
Pull on tubing to confirm connection is
secure. Connect tubing to frame with
water tubing clamp (C) and turn on
water supply. Check for leaks and
correct if necessary. Continue to
observe the water supply connection
for two to three hours prior to moving
the refrigerator to its permanent
location.
7. Monitor water connection for 24 hours, Correct
leaks, if necessary,
Loading ...
Loading ...
Loading ...