Loading ...
Loading ...
Loading ...
Before drilling any holes check that the area behind the surface to be drilled is clear of any
electrical cables, pipes etc. The ceiling must take a weight bearing of at least 40kgs weight.
Whenever possible protect the Rangehood with a fabric sheet or similar.
1. Before commencement unpack the rangehood plug it in and check that it functions correctly.
2. Use a plumb line to mark the centre of the cooking surface on the ceiling.
3. Ensure that the support frame front edge is parallel with the bench top and that the plumb line
mark is central to the mounting screw holes.
4. Drill 1*170mm round hole in the ceiling for the if you are ducting the Island Rangehood
5. In accordance with the hanging board, drill 12 holes in the ceiling, see pic 2, 12pcs of
ST6*40mm big flat screws will be used to fix the hanging board on the ceiling, and then 8pcs
of M4*10 screws and M4 nut with gasket will be used to connect the angle iron into the
hanging board, see pic 1, calculated the length of the angle iron, and 16pcs M4*10 big flat
screws and M4 nut with gasket will be used to connect the angle iron and another angle iron
(the overlap length of angle iron can not less 100MM)
1. Let the one side of the ducting (not supplied) go outside through the hole of 170MM, see pic 3.
4pcs ST4*8 big flat screws will be used to connect the internal chimney into the hanging board,
then put one the external chimney, two hooks will be used to put up the external chimney in
order to the next installation, see pic 4.
1. 4pcs ST4*8 big flat screws will be used to install the outlet, see pic 5.
2. Hold up the hood, 16pcs M4*10 big flat screws will be used to connect the hood body into
angle iron, see pic 6.
3. Put the ducting pipe on the outlet; after ensure all the things ok, put down the hook, take from
the external chimney, all the installation is finished, see pic 7 & 8.
Installation
Loading ...
Loading ...
Loading ...