Procom ML200HBA

User Manual - Page 12

For ML200HBA.

PDF File Manual, 28 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
www.usaprocom.com
200158-01A12
INSTALLATION
CONNECTING TO GAS SUPPLY
WARNING: A qualied ser-
vice technician must connect
heater to gas supply. Follow all
local codes.
WARNING: This appliance
requires a 3/8" NPT (National
Pipe Thread) inlet connection to
the pressure regulator.
WARNING: Do not over-
tighten gas connections.
CAUTION: Use only new,
black iron or steel pipe. Inter-
nally tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of
1/2" diameter or greater to allow
proper gas volume to heater. If
pipe is too small, undue loss of
pressure will occur.
CAUTION: Never connect
heater directly to the gas supply.
This heater requires an external
regulator (not supplied). Install
the external regulator between
the heater and gas supply. Gas
supplier provides external regula-
tor for natural gas. The installer
provides the external regulator
for propane/LP gas.
CAUTION: Avoid damage to
regulator. Hold gas regulator
with wrench when connecting
into gas piping and/or ttings.
CAUTION: Use pipe joint seal-
ant that is resistant to propane/
LP gas.
Before installing heater, make sure you have
the items listed below:
external regulator for propane/LP unit only
(supplied by installer)
piping (check local codes)
sealant (resistant to natural gas and pro-
pane/LP gas)
equipment shutoff valve*
test gauge connection*
sediment trap
tee joint
pipe wrench
exible gas hose (check local codes)
* A CSA design-certied equipment shutoff
valve with 1/8” NPT tap is an acceptable al-
ternative to test gauge connection. Purchase
the optional CSA design certied equipment
shutoff valve from your dealer.
Loading ...
Loading ...
Loading ...