LG Electronics DLG1002W/00 LG dryer

User Manual - Page 27

For DLG1002W/00.

PDF File Manual, 84 pages, Download pdf file

Loading ...
Loading ...
Loading ...
INSTALLAiTIONINSTRUCTIONS27
Installation test (Duct check}
Once you have completed the installation of the dryer,
use this test to make sure the condition of the exhaust
system is adequate for proper operation of the dryer.
This test should be performed to alert you to any serious
problems in the exhaust system of your home.
Your dryer features FLOW SENSETM, an innovative
sensing system that automatically detects blockages
and restrictions in dryer ductwork. Keeping ductwork
clean of lint buildup and free of restrictions allows
clothes to dry faster and reduces energy use.
It @NOTE
The dryer should be cool before starting this test. If
the dryer was warmed up during installation, run the
AIR DRY cycle for a few minutes to reduce the interior
emperature
To activate the installation test:
1. Remove the literature, and then close the door.
Do not load anything in the drum for this test, as it
may affect the accuracy of the results.
,!
2, Press and hold the TEMP. CONTROL and OPTION
buttons and then press the POWER button.
This button sequence activates tile installation test.
The code _ will display if the activation is
successful.
4, Check the display for results.
During the three minute test cycle, monitor the
FLOW SENSETM display on the control panel. If no
bars are displayed, when the cycle ends, the exhaust
system is adequate. If the exhaust system is severely
restricted, the display will show four bars. Other
problems may also be shown with error codes. Refer
to the next page for error code details and solutions.
NO BARS: FOUR BARS:
OK RESTRICTED
Four bars indicates that the exhaust system is severely
restricted. Have the system checked immediately, as
performance will be poor.
5. End of cycle.
At the end of the test cycle, _ will display.
The test cycle will end and the_ will shut off
automatically after a short delay.
3. Press START/PAUSE button.
The dryer will start the test, which will last about
two minutes. The heat will be turned on and the
temperatures in the drum will be measured.
Loading ...
Loading ...
Loading ...