Loading ...
Loading ...
Loading ...
INITIAL INSTALLATION
7
You may need to cut the lead wires back to simplify
the wiring. If you decide to cut back the lead wires, it
is suggested you do so in the following manner:
Take the lead wires and make sure you have pulled
them all the way through the top of the downrod.
Start at the TOP of the hanging ball on the downrod
and measure 8 in. of lead wire, and then cut the
excess wire off with wire cutters (not included).
NOTE: If you do not cut back the lead wires, Steps
5 and 6 are not necessary and you may proceed
to Step 7 instead.
5.
Install hanging ball of downrod (A) into opening of
mounting bracket (C). Align one of the slots in
hanging ball with the tab in mounting bracket (C).
DANGER: Failure to align one of the slots in
hanging ball with the tab in mounting bracket (C)
may result in serious injury or death.
7.
If you cut back the lead wires in Step 5, strip 1/2 in.
of insulation from end of white wire. Twist stripped
ends of each strand of wire within the insulation
with pliers. Repeat Step 6 for black, blue (if
applicable) and green wires.
6.
5
6
Hanging
Ball
A
8 in.
C
A
7
Slot
Tab
Loading ...
Loading ...
Loading ...