Loading ...
Loading ...
Loading ...
ENGLISH 17
To pause press Start/ Pause.
The indicator will start flashing.
-
Press the Start/Pause again.
The program will continue.
-
Changing a running program is possible
only by switching off the appliance.
Press the “On/Off” button to cancel
the program and to turn off the
appliance.
-
5.2 Interruption Of A Program
5.3 Changing A Program
It is possible to change only some options
after the program has started.
Press the touchpad “Start/Pause”. The
indicator will start flashing.
1.
Change the options.2.
Press “Start/Pause” again. The program
will continue.
3.
While a program or the Delay Start is
operating, the appliance door is locked
and the display shows the indicator “ ”.
Press the “On/Off” button again to start
the appliance. Now, you can set a new
washing program.
The appliance will not drain the
water.
-
5.4 Changing The Options
5.5 Opening The Door
First set the machine to PAUSE by pressing
the “Start/Pause” touchpad. Wait until the
door lock indicator “ ” goes off, then the
door can be opened.
If the door lock indicator “ ” does not
disappear, this means that the machine is
already heating and the water level is above
the bottom edge of the door or the drum is
turning. In this case the door CAN NOT be
opened.
If you can not open the door but you
need to open it you have to switch
the machine off by pressing the
“On/Off” button to deactivate the
appliance. After about 5 minutes the
door can be opened.
Pay attention to the water
level and water temperature.
CAUTION!
The appliance stops automatically.
The acoustic signal will operate.
The display will show “ ”.
The indicator of the touchpad
Start/Pause goes off.
-
-
-
-
-
-
-
-
The door lock indicator “ ”
goes off.
Remove the laundry from the
appliance. Make sure that the
drum is empty.
Keep the door ajar, to prevent the
mildew and odours.
Turn off the water tap.
5.6 At The End Of The Program
At the end of the program
the time remaining can
suddenly decrease from 7
minutes or less to 0 due to
the overestimated total
program time during the load
sensing phase. In some
cases (with perfectly
balanced load) the program
time can be shorter than the
time estimated after the load
sensing phase is completed.
This is a normal behavior of
the machine and not a cause
for concern as it does not
compromise its performance.
Loading ...
Loading ...
Loading ...