Craftsman 247888520 snow thrower

User Manual - Page 7

For 247888520.

PDF File Manual, 40 pages, Read Online | Download pdf file

247888520 photo
Loading ...
Loading ...
Loading ...
Secure bottom hole in the handle to the snow
thrower using 5/16 x0.75" hex bolt and lock
washer from the hardware pack (group A on
page 5 ).Do nottighten at this time. See Figure2.
Lock Washer &
Hex Bolt (1-3/4")
Right Handle
Handle _[Washer &
Tab Hex Bolt (3/4")
Figure 2
Place a handle tab, included inthe hardware
pack (group Aon page 5),over the upper hole in
handle so that the contour of the handle tab
matches that of the handle. See Figure 2.
Secure handle tab to the snow thrower using
hex bolt (5/16 x 1.75" long) and lock washer
from the same group in the hardware pack. Do
not tighten at this time.
Attach the left handle in the same manner. Do
not tighten at this time.
Place the handle panel in position between the
handles so the ends of the curved part of the
handles go through the slots in the handle panel.
While placing the handle panel, make sure to
route chute and chute cable between the
handles underneath the panel keeping the cable
on top of the engine. Align the holes in the
handle with theholes on two sides ofthe handle
panel. See Figure 3.
Right Handle
Hex Bolt
and Flange
Nut
\
Handle Panel
CarriageBolt,
andHexNut
Figure 3
nHoles
Attach the handle panelto the handle with two
carriage bolts, cupped washers (cupped side
against the handle panel) and hex nuts on each
side. See Figure 3. You will find these fasteners
in the hardware pack (group B on page 5). Align
the contour of the carriage bolt head with the
handle.
Attaching Chute
Place thechute assemblyover thechute
opening withthe chute facingfrontof the unit.
NOTE: Make sure that the chute cables are
straightened while assembling the chute.
Place the chute flange keeper (flat side down)
beneath lip of chute assembly as shown in
Figure 4.You will find the chute flange keepers in
group E of the hardware pack.
Insert 1/4-20 hex bolt and flange nutfrom group
E up through chute flange keeper and chute
assembly as shown in Figure 4. Do nottighten at
this time. Rotate chute to install all the flange
keepers.
Chute
Hex
Nut
\
Chute
'_e Flange
x Keeper
Bolt
Figure 4
After assembling all three chute flange keepers,
tighten, then back off 1/4 turn to allow easier
movement of the chute. Use (2) 7/16" wrenches.
Attaching Chute Crank
On the leftside ofthe handle panel, place the
upperchute crankbracket on totheinsideofthe
handle panelsupport. See Figure5. You willfind
thisbracket and associated hardware in group F
of hardware pack
Insert hex bolt through the upper chute crank
bracket, handle panel support, and upper left
handle. Secure the bracket using cupped
washer and hex nut. Make sure that the cupped
side ofthe washer is set against the handle.
Loading ...
Loading ...
Loading ...