Loading ...
Loading ...
Loading ...
39
Step 1 Determine Location for
Concrete Pad and Operator
Compact Installation Only
DO NOT run the operator until instructed.
Refer to the illustration to determine the measurements and location of
the concrete pad.
NOTE: When lifting the operator use the handle to avoid damaging the
operator.
Step 2 Concrete Pad and Operator
Attachment
Compact Installation Only
CHECK the national and local building codes before installation.
NOTE: When lifting the operator use the handle to avoid damaging the
operator
1. Install the electrical conduit.
2. Pour a concrete pad (reinforced concrete is recommended). The
concrete pad should be 6 inches (15.2 cm) above the ground and
deeper than the frost line. Ensure the pad is tall enough to avoid
possible flooding.
3. Secure the operator to the concrete pad with appropriate fasteners.
NOTE: An alternative to a concrete pad is to post mount the operator, see
Accessories.
APPENDIX
Loading ...
Loading ...
Loading ...