GE - General Electric GPF400S Dishwasher Trim Kit

User Manual - Page 8

For GPF400S.

PDF File Manual, 32 pages, Download pdf file

Loading ...
Loading ...
Loading ...
8
Installation Preparation
CleanSensor Dishwasher
Hot water line may enter from either side,
from the rear, or from the floor within the
shaded area shown.
Cut a hole approximately 1-1/2" in diam-
eter to admit water line.
Install a hand shut-off valve in the supply
line in an accessible location, such as under
the sink. (The shut-off valve is optional, but
recommended and may be required by local
codes.)
When installing two dishwashers side-by-side,
route the water supply line as shown.
Follow installation instructions for each
dishwasher.
Water connection is on the left side of the
dishwasher. Install hot water line using no
less than 3/8" O.D. copper tubing or 1/2"
O.D. plastic tubing. Route water line as
shown and extend the line forward at least
19" from the rear wall.
Allow at least 2" clearance between water
line and adjacent cabinet wall as shown.
Before connecting, flush water line to clean
out debris.
Water
Supply
Double
Dishwashers
6"
5"
1-1/2" Dia.
Hole
5"
4"
19" from Wall
2" from Floor
Cabinet Face
2"
from
Cabinet
Hot
Shut-off
Valve
4"
1/2" O.D. Copper
Recommended To Here
Water Supply For 2-Dishwasher Installation
4"
5"
5"
5"
4"
5"
4"
6"
24"
Toe
Space
48" Min.
Cut Off Valve
Optional
Loading ...
Loading ...
Loading ...