GE - General Electric GPF400S Dishwasher Trim Kit

User Manual - Page 7

For GPF400S.

PDF File Manual, 32 pages, Download pdf file

Loading ...
Loading ...
Loading ...
7
Installation Preparation
CleanSensor Dishwasher
The rough cabinet opening must be 24"
min. deep and 24" wide. The opening
height should be 34" min. and 35" max.
The opening should be free of extraneous
pipes and wires.
Single
Dishwasher
Double
Dishwasher
When installing double dishwashers,
side-by-side:
The opening should be 48" wide.
Depth and height are the same as for single
unit.
Double
Dishwashers
Divider Panel
Preparation
A divider panel must be used for double,
side-by-side installations.
The divider must be supplied by the
installer at the time of installation. Locate
the divider panel in the center of the 48"
opening.
Attach the divider panel to the floor,
countertop and rear wall.
Plumbing and Electric Services
Must Enter Inside This Area
6"
24"
Min.
This Wall Area
must be Free of
Pipes or wires
34-1/2"±1/4"
Underside of
Countertop
to Floor
4"
24"
Min.
5"
5"
4"
Cabinets
Square
and Plumb
48" Min.
24"
1/8"
Thick
Masonite
24-1/4"
34-1/2"
5"
2"
Loading ...
Loading ...
Loading ...