GE - General Electric GNSF35Z01 GE water system

User Manual - Page 6

For GNSF35Z01.

PDF File Manual, 28 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installation Instructions
BEFORE YOU BEGIN
Turn off the gas or electric supply to the water
heater, in the possibility that the water heater
may be drained while draining pipes.
Turn off the water supply to pipes to be cut and
drain the house water pipes.
Open both hot and cold faucets at the lowest
location possible.
NOTE: For easier installation, remove the top cover.
Release 2 clips at rear of cover. Rotate cover
forward and lift up.
[_ MOVE THE SOFTENER ASSEMBLY
INTO INSTALLATION POSITION
Before sliding softener in position, be sure the
installation surface is level and smooth. Sharp
objects under the tank may puncture it. If needed,
place the tank on a section of 5/4" thick (minimum)
plywood. Then, place shims under the plywood as
needed to level the softener. Slide softener into
position.
I_1 INSTALL BYPASS VALVE
Remove plastic shipping plug and wire from valve
outlet.
Turbine
"'_ Valve outlet
Turbine shaft and
_J support
NOTE: Be sure the turbine and support are firmly
in place in the valve outlet. Blow into the valve port
and observe the turbine for free rotation.
Push the bypass valve (lubricate o-ring seals with
silicone grease) into both ports of the valve as
shown.
Clips
_i _:_ Outlet . NPT
Drain fitti_ __q_ _-d--apl _p
ass
/
O-ring seal goes into the outer
groove only. The clip snaps into
the inner groove (see below).
Snap the 2 large plastic clips in place, from the
top down, as shown.
SIDE Clip
VIEW END
VlEW
Valve bod, Bypass valve
inlet or (push all the way in)
Push the NPT adapters (lubricate o-ring seals with
silicone grease) into both ports of the valve as
shown.
Snap the 2 large plastic clips in place, from the
side, as shown. 6
Loading ...
Loading ...
Loading ...