Loading ...
Loading ...
Loading ...
7
Pre-Installation Requirements
Tools and materials needed for installation:
Adjustable
pliers
Adjustable
wrench
OR OR AND AND
Carpenter’s level
Ratchet and
socket set
3/8" or
10 mm
box wrench
Shipping Hardware
Foam shipping support (under wash
tub) removed and stored
Shipping bolts and spacers removed
from rear of appliance and stored
Hole plugs (shipped in bag in drum)
installed in holes in backsheet
Leveling
Washer is level, side-to-side and
front-to-back
Cabinet is sitting solid on all corners
Water Supply
Use only new hoses and verify
rubber sealing washers are installed
HOT supply is connected to HOT
inlet and COLD supply is connected
to COLD inlet
HOT and COLD water supply
turned on
No leaks present at water supply
connections or appliance inlet
connections - recheck in 24 hours
Drain
Stand pipe or wall drain height
minimum 24”
Verify anti-siphon disc is attached
toward end of drain hose
Drain hose secured in place with
cable tie (shipped in drum)
Door Reversal
Follow detailed instructions in
this guide
Test hinge and latch for function
Electrical Power
House power turned on
Washer plugged in
Final Checks
Installation instructions and Use
& Care Guide read thoroughly
Door locks and water enters drum
when cycle starts
Registration card sent in
Inlet
Hose
(x2)
NOTE
Hoses are not included with washer purchase.
Electrical system requirements
CIRCUIT - Individual, properly polarized
and grounded 15 amp. branch circuit
fused with 15 amp. time delay fuse or
circuit breaker.
POWER SUPPLY - 2 wire, with ground,
120 volt single phase, 60 Hz, Alternating
Current.
OUTLET RECEPTACLE - Properly
grounded 3-prong receptacle to be
located so the power supply cord is
accessible when the washer is in an
installed position.
Installation Checklist
Loading ...
Loading ...
Loading ...