INSTALLATION
WALL DRILLING AND BRACKET FIXING
As the rst step, proceed with the following drawings:
● A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be tted.
● A horizontal line A at 1083-1183 mm above the cooker top.
● A horizontal line B at 30-377 mm above the horizontal line A.
● A horizontal line C at 118 mm below the horizontal line A.
Mark points:
● Mark a point (1) on the horizontal line A, 60 mm to the vertical reference line.
● Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are on one horizontal line.
● Mark a point (2) on the horizontal line B, 60 mm to the vertical reference line.
● Repeat this operation on the other side, checking that the two marks are on one horizontal line.