Loading ...
Loading ...
Loading ...
49-5000525 Rev. 0 11
INSTALLATION INSTRUCTIONS
Installation Instructions
4. PREPARE THE CASE
A. Attach top rail foam gasket to top of case over
holes.
B. Mount top rail and side retainers to case. (10
screws)
C. Slide window accordions into side retainers on
each side of the case. The accordion panel
frames are marked LEFT and RIGHT.
D. Insert the top and bottom legs of the accordion
panel frames into the channel of the top rail and
bottom rail.
E. ,QVHUWWKHZDVKHUKHDGORFNLQJ´VFUHZV
into the holes in the top legs of the accordion
pan frame. Do not completely tighten.
3. PREPARE THE AIR
CONDITIONER (cont)
D. Disconnect the connector.
E. Remove the six shipping screws holding the
unit. Two at the top, and two on each side along
the base.
F. While holding the outer case with one hand, pull
the base pan handle to remove the unit from the
case.
G.8VHWKHWZRIRDPLQVHUWVWRFRYHUWKHWZRKROHV
at the top of the case where the screws were
removed.
H. The unit may have internal packaging to prevent
damage while shipping. This needs to be
remove prior to reinstalling in the outer case.
Shipping
Packaging
Plastic
Tie
´/RFNLQJ6FUHZDQG:DVKHU
TOP VIEW
Air Conditioner
Cabinet
Plastic Frame
Window
Accordion Panel
³,´6HFWLRQ
Locking
Screw Hole
Side Retainer
Plastic Frame
Window
Accordion Panel
´ORQJ
hex-head
Shipping Screws
Loading ...
Loading ...
Loading ...