www.factorybuysdirect.com
17200253-01A
Log #1
Log #2
Log #3
Log #5
Burner
Ports
Log #4
PRESSURE TESTING HEATER GAS CONNECTIONS
INSTALLING LOGS
Figure 18 - Installing Logs 1, 2 and 3
Figure 19 - Installing Logs 4 and 5
INSTALLATION
1. Open equipment shutoff valve (see Figure
15, page 16).
2. Open main gas valve located on or near
gas meter for natural gas or open pro-
pane/LP supply tank valve.
3. Make sure control knob of heater is in the
OFF position.
4. Check all joints from equipment shutoff
valve to control valve (see Figure 16 or
17, page 16). Apply a noncorrosive leak
detection uid to all joints. Bubbles form-
ing show a leak.
5. Correct all leaks at once.
6. Light heater (see Lighting Instructions on
page 19). Check all other internal joints
for leaks.
7. Turn off heater (see To Turn Off Gas Ap-
pliance, page 20).
WARNING: Failure to posi-
tion the parts in accordance
with these diagrams or failure
to use only parts specically
approved with this heater may
result in property damage or
personal injury.
CAUTION: After installation,
and periodically thereafter,
check to ensure that no ame
comes in contact with any log.
With the heater set to high, check
to see if ames contact any log. If
so, reposition logs according to
the log installation instructions
in this manual. Flames contact-
ing logs will create soot.
1. Install log 1 onto the two slots in the middle
plate (see Figure 18).
2. Install log 2 onto the two slots in the left
plate (see Figure 18).
3. Install log 3 onto the two slots in the right
plate (see Figure 18).
4. Install the recessed hole on the bottom of
log 4 onto the pin on log 1 and place onto
log 3 (see Figure 19).
5. Install the recessed hole on the bottom of
log 5 onto the pin on log 1 and place onto
log 2 (see Figure 19).
IMPORTANT: Make sure logs do not cover
any burner ports (see Figure 19). It is very
important to install the logs exactly as in-
structed. Do not modify logs. Use only logs
supplied with heater.