Loading ...
Loading ...
Loading ...
Inverter Window Air Conditioner
23
Installation & Assembly Instructions
Important Considerations
• Before installing the appliance, you must read the
manual carefully to get the safety information and
notes.
• Unit refrigerant charge amount: refer to unit name
plate marking.
• A leak test must be done after the installation is
completed.
• It is a must to do the safety inspection before
maintaining or repairing an air conditioner using
combustible refrigerant in order to ensure that the
fire risk is reduced to minimum.
• It is necessary to operate the machine under a
controlled procedure in order to ensure that any
risk arising from the combustible gas or vapor
during the operation is reduced to minimum.
If AC Is Blocked By Storm Window
SASH
1-1/2” min
(38 mm)
Storm window
frame or other
obstruction.
Board thickness as
required, for proper
pitch to rear, along
entire sill. Fasten
with nails or screws.
OUTSIDE INSIDE
• Add wood as shown, or remove storm window before air conditioner is
installed.
• If Storm Window Frame must remain, be sure the drain holes or slots are
not caulked or painted shut. Accumulated Rain Water or Condensate must
be allowed to drain out.
Loading ...
Loading ...
Loading ...