Loading ...
Loading ...
Loading ...
24
17. Plug into a grounded 3 prong outlet
Complete Installation Checklist
q
Check electrical requirements. Be sure you have correct
electrical supply and recommended grounding method.
q
Check that all parts are now installed. If there is an extra
part, go back through steps to see what was skipped.
q
Check that you have all of your tools.
q
Check that transport bolts were completely removed from
back of washer.
q
Check that hose is attached and water faucet is on.
q
Check for leaks around faucet, valve, and inlet hose.
q
Remove any tape remaining on washer.
q
Check that washer is plugged into a grounded 3 prong
outlet.
q
Dispose of/recycle all packaging materials.
q
Read “Using Your Washer.”
q
To test and clean your washer, turn on the washer and
choose the Normal cycle and run it without clothes. Use only
HE detergent. Use 1/2 the manufacturer’s recommended
amount for a medium-size load.
When washer is level and all four feet are rmly in contact with
the oor, use a 1/2" (13 mm) open-end or adjustable wrench to
turn jam nuts counterclockwise on leveling feet tightly against
washer cabinet.
HELPFUL TIP: You may want to prop washer with wooden
block.
16. Tighten leveling feet
Jam nut
Loading ...
Loading ...
Loading ...