Loading ...
Loading ...
Loading ...
(continued)
REQUIRED VENTILATION
TESTING AND INITIAL START UP
Ventilation is provided by a forced air system through a grill in the top of the refrigerator.
This open space in the grill cannot be restricted by any cover or device that would reduce
the proper air ow, product efciency and energy consumption.
PROPER AIR CIRCULATION (KRP top compressor models)
PRETEST CHECKLIST
Check that the front levelling feet have been properly installed.
Check that the connection to the water system does not have any
leaks and that the closing tap is easily accessible.
Check that the electrical connection is correctly installed and that
the circuit breaker and socket are easily accessible.
Check the perfect alignment of the appliance with adjacent
structures.
Check that all adhesive tape and external or internal temporary
protective packaging have been removed.
Check the perfect closing of the doors and the smooth sliding of
the drawers and shelves.
©2018 Hestan Commercial Corporation
30
EN
Loading ...
Loading ...
Loading ...