Loading ...
Loading ...
Loading ...
9
Pre-Installation Requirements
Tools and materials needed for installation:
Exhaust Venting
Free-flowing, clear of lint buildup
4 inch (102 mm) rigid metal or
semi-rigid metal transition ducting
of minimal length and turns
NO foil or plastic venting material
Approved vent hood exhausted to
outdoors
Leveling
Dryer is level, side-to-side and front-
to-back
Cabinet is sitting solid on all corners
Gas Supply (Gas Dryer)
Manual shutoff valve present in
supply
All connections sealed with approved
sealer and wrench tight
Conversion kit for LP GAS system
Gas supply turned on
No leaks present at all connections
- check with soapy water, NEVER
check with flame
Water Hookup (Select Models)
Inspect hoses for proper placement
of rubber washers
Water supply is turned on
Check for leaks
Steam model dryers require use of
ASSEMBLY HOSE KIT #5304495002
(not included) and must be
purchased separately.
240v Electric Supply
(Electric Dryer)
Approved NEMA 10-30 or 14-30
service cord with all screws tight on
terminal block
Approved strain relief installed
Terminal access cover installed
before initial operation
Door Reversal
Follow detailed instructions in this
guide
Test hinge and latch for function
Electrical Power
House power turned on
Dryer plugged in
Final Checks
Installation Instructions and Use &
Care Guide read thoroughly
Door latches and drum tumbles
when cycle starts
Registration card sent in
Installation Checklist
Loading ...
Loading ...
Loading ...