Zip HT2888Z9 HydroTap Arc Chilled Filtered Water

User Manual - Page 9

For HT2888Z9.

PDF File Manual, 16 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
802261 - Residential HT- CO Installation Instructions - March 2016 - V3.00 Page 9 of 16
2.1 Ventilation for All Models
Proper air circulation must be provided for all Boiling and Chilled models. The system will operate correctly
only if the recommended air gaps are achieved during Installation. The minimum requirement is for a 50mm air
gap either side and 300mm above of the undersink unit.
It is important that the 4mm door buffers (For all installations ) are fitted to the inside edge of the cupboard
door to allow suficient air circulation inside the cupboard. (See the diagram below).
IMPORTANT:
See section 4 for clearances.
When installing air flow ducts, the following tools will be required:
Jigsaw and 12mm Drill
Keyhole or Wall Board saw.
Section 2
Ventilation
4mm Buffer
Pad to ensure
ventilation gap
Min 300mm
476 mm
Loading ...
Loading ...
Loading ...