Napoleon BHD4STN Ascent Multi-View

User Manual - Page 48

For BHD4STN.

PDF File Manual, 144 pages, Read Online | Download pdf file

BHD4STN photo
Loading ...
Loading ...
Loading ...
W415-1285 / L / 10.25.21
EN
48
finishing
11.11.1 glowing embers
11.11.2 charcoal embers
11.11.3 charcoal lumps
22.1A
Tear the embers into pieces and loosely layer above the burner ports covering the burner area. Care should be
taken to shred the embers into thin, small irregular pieces as only the exposed edges of the fi bre hairs will glow.
The ember material will only glow when exposed to direct fl ame; however, care should be taken to not
block off the burner ports.
Blocked burner ports can cause an incorrect fl ame pattern, carbon deposits and delayed ignition. PHAZER™
logs glow when exposed to direct fl ame. Use only certifi ed “glowing embers” and PHAZER logs available from
your local authorized dealer / distributor.
!
WARNING
Completely blocking the burner ports can cause an incorrect fl ame pattern, carbon deposits and delayed
ignition.
22.2
Randomly place the charcoal embers along the front and sides of the log support in a realistic manner.
Fine dust found in the bottom of the bag should not be used.
!
WARNING
Do not block or close off the burner ports. Blocked ports can cause an incorrect fl ame pattern, carbon
deposits and delayed ignition.
When supplied, charcoal embers, charcoal lumps and vermiculite are not to be placed on the burner.
note:
Charcoal embers are not to be placed on the burner.
22.4
Place the lumps in front of the logs in a realistic manner taking care not to block or close off any of the burner ports.
!
WARNING
Do not block or close off the burner ports. Blocked ports can cause an incorrect fl ame pattern, carbon
deposits and delayed ignition.
When supplied, charcoal embers, charcoal lumps and vermiculite are not to be placed on the burner.
Loading ...
Loading ...
Loading ...