Loading ...
Loading ...
Loading ...
5
Scope of Delivery
125l 135l 150l 180l 210l 250l 300l
2 2 2 2 2 2 2
1/2”, 7bar/90°C
18 l
15mm/22mm
15mm/22mm
12 l 24 l
15mm/22mm
Terms and conditions x 1
Inlet control group consisting of:-
Expansion vessel with fixing kit and
connection hose
Tundish
Installation & User Instructions x 1
- in line strainer
- 3 bar PRV
- 6 bar ERV
- non-return valve
- balanced cold water supply port
Scope of delivery
T+P valve *
Cylinder volume
Cylinder with 3kW immersion *
1/2”, 7bar/90°C 1/2”, 7bar/90°C
- connection for expansion vessel
4 Scope of Delivery
Table 1: Scope of Delivery for Edel Water Heater
*Theseitemsaresuppliedfactorytted
5 Pre-Installation
Please read the following section carefully before
commencing installation. If in any doubt, please
call the appropriate help desk. Disregarding the
instructions given in this manual in its entirety
and any relevant regulations, standards and codes
of practice will void the guarantee of this product.
Handling – depending on the size of the unit and
access to its installation location,
consideration must be given to the handling of the
unit. Please note that handling, installation and
use of this product is subject to the Health and
Safety at Work Act. If the unit is not installed im-
mediately, it should remain in its protective pack-
aging with all pipe protectors/end caps
applied to prevent damage and dirt deposit inside
the cylinder.
Pipe Work – the pipe runs should be executed
as short as possible, unused pipe work should be
removed and all remaining pipe work should be
lagged in accordance with regulatory
requirements to prevent heat loss and the
formation of condensation.
Taps and Fittings–alltapsandttingsincorpo-
rated in the unvented system should have a rated
operating pressure of 0.6 MPa (6 bar) or above.
5.1 Risk Assessment
The compilation of a risk assessment is strongly
recommended before installing the product. The
following areas require particular consideration in
addition to the information required by the Health
and Safety at Work Act.
Scalding - where appropriate or required by law
athermostaticmixingvalveistobettedtothe
hot water outlet of the cylinder (see also water
borne organisms).
Explosion - the unit is fully equipped with all
relevant safety equipment to comply with current
regulations. The correct design and function has
beenveriedbyindependentthirdpartytesting.
The correct application thereof is the responsibility
of the installer.
Water Borne Organisms (i.e. Legionella) -
if applicable a risk assessment should be carried
out following the recommendations outlined in the
Approved Code of Practice L8.
The user preference must be considered when
commissioning the system, in particular when
adjusting the temperature and timer settings.
Loading ...
Loading ...
Loading ...