INSTALLATION
Figure 4 - Rough Opening for Installing
in a Wall
Figure 3 - Minimum Mantel Clearances
for Built-In Installation
Figure 5 - Rough Opening for Installing
in a Corner
NOTICE: Surface temperatures
of adjacent walls and mantels
become hot during operation.
Walls and mantels above the
replace may become hot to the
touch. If installed properly, these
temperatures meet the require-
ment of the national product
standard. Follow all minimum
clearances shown in this manual
(see Figure 3).
1. Frame in rough opening. Use dimensions
shown in Figure 4 for the rough opening.
If installing in a corner, use dimensions
shown in Figure 5 for the rough opening.
The height is 23.66" (PC32VFC) and
28.11" (PC36VFC), which is the same as
the wall opening above.
2. Carefully set firebox in front of rough
opening with back of replace inside wall
opening.
3. Install gas piping to rebox location. See
Installing Gas Line, on page 9 and Con-
necting to Gas Supply in log set owner’s
manual.
34
1
/
4
" (PC32VFC)
42
1
/
4
" (PC36VFC)
31
1
/
4
" (PC32VFC)
36
1
/
4
" (PC36VFC)
18"
35
1
/
2
" (PC32VFC) 43
1
/
2
" (PC36VFC)
31
1
/
8
"
(PC32VFC)
28
1
/
8
"
(PC36VFC)
39
3
/
4
" (PC32VFC)
44" (PC36VFC)
56
1
/
4
" (PC32VFC) 62
1
/
4
" (PC36VFC)
Bottom Edge
of Vent Hood
Fireplace
2
1
/
2
"
4"
6"
8"
10"
12"
10"
Note: All vertical measurements
are from lower edge of vent
hood to bottom of mantel shelf.
42" to
Ceiling
Safe
Zone
1.0 Slope
Factor
Wall
Surface
Mantel
Shelf
14"
16"
18"
2"
IMPORTANT: When nishing your rebox,
combustible materials such as plywood and
wood framing must have 3/4" clearance to
the sides and top of the rebox. Combustible
materials should never overlap the rebox
front facing. Noncombustible materials such
as wall board, gypsum board, sheet rock may
be placed at 0" clearance to the sides and top
of the rebox.