Superior Pump F0453 Superior 42" Outdoor Wood Burning Fireplace Insert Only

User Manual - Page 10

For F0453.

PDF File Manual, 24 pages, Read Online | Download pdf file

F0453 photo
Loading ...
Loading ...
Loading ...
Superiorfireplaces.US.com
127055-01E
10
VENTING INSTALLATION Continued
Pitch Slope Opening
"A"Max.
UsedFlashing
ModelNo.
Flat 15" V6F-8DM
0-6/12 26.6° 16
1
/
8
" V6F-8DM
6/12- 12/12 45.0° 20
3
/
8
" V12F-8DM
Figure 12 - Roof Opening Measurements
FLASHING INSTALLATION (V6F-8DM OR V12F-8DM)
Determine flashing to be used with roof opening chart. Slide flashing
over pipe until base is flat against roof. Replace as many shingles as
needed to cover exposed area and flashing base. Secure in position


Installing Flashing on a Metal Roof
When installing flashing on a metal roof, it is required that putty tape
be used between flashing and roof. Flashing must be secured to roof
using #8 x 3/4" screws and then sealed with roof coating to prevent
leakage through screw holes. A roof coating must also be applied
around perimeter of flashing to provide a proper seal.
Nail Only Outer
Perimeter of
Flashing
Storm Collar
Underlap Shingles
at Bottom
Figure 13 - Flashing Installation
Flashing
Cone
Overlap
Shingles Top
and Sides Only
Figure 11 - Firestop Spacer with Attic Space Above Ceiling
NOTICE: The installation of a firestop thimble (FST30
or 38FST) is recommended when negotiating a joist
and to prevent intrusion from insulation.
30"
(76.2 cm)
Minimum Measurements
Opening "A"
14
3
/
8
"
(48.3 cm)
1"
(2.54
cm)
1"
(2.54
cm)
1"
(2.54 cm)
Firestop
Spacer
Screws or Staples
(Min. of 8)
Existing
Ceiling
Frame
Figure 11a - Firestop Thimble
Thimble
38FST or
FST30
Firestop
PENETRATING ROOF
To maintain a 1" clearance to pipe on a roof with a pitch, a rectangular
opening must be cut.
1. Determine center point where pipe will penetrate the roof.
2. Determine center point of the roof. Pitch is the distance the roof
drops over a given span, usually 12". A 6/12 pitch means that the
roof drops 6" for each 12" measure horizontally down from roof
rafters.

length and flashing required.



sections of double wall pipe until pipe is minimum of 30" above
highest point of roof cutout. Termination and chimney must extend
a minimum of 36" above highest point where it passes through
roof.
Loading ...
Loading ...
Loading ...