PowerSmart PSSMN24 Blower

User Manual - Page 14

For PSSMN24.

PDF File Manual, 117 pages, Read Online | Download pdf file

PSSMN24 photo
Loading ...
Loading ...
Loading ...
13
Step 2: Installing the Upper Handle
1. When installing the Upper Handle, please note that the Drive & Auger Cables will already be
pre-attached to Upper Handle.
2. Attach Upper Handle using the Frame Handle Assembly Hardware (4 sets /Knob, Saddle
Washer, M8 Nut, T-Screw) for your Upper & Lower Handle connection.
3.
When attaching Assembly Hardware, make sure ALL cables are underneath the Frame (Upper &
Lower) Handles after installation as indicated in Figure 3. VERY IMPORTANT!!!***
***Assembling Drive & Auger Cables over the top of the Frame
Handle will cause unnecessary tension in the cables, resulting in the Snow
blower propelling forward when starting the engine and may cause damage to the
drive & auger control
(levers) when trying to engage them.
4.
Cut and remove all tie wraps that are on Cables, Frame Handles, Drive Control (Lever) &
Auger Control (Lever).
5.
Verify that the connection for the Upper & Lower Drive/Auger Cables is accurate. (See
Figure 3)
Figure 3
Loading ...
Loading ...
Loading ...