Loading ...
Loading ...
Loading ...
18
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT ³6DYHWKHVHLQVWUXFWLRQVIRU
local inspector’s use.
IMPORTANT ³2EVHUYHDOOJRYHUQLQJ
codes and ordinances.

Note to Installer – Be sure to leave these
instructions with the Consumer.
 1RWHWR&RQVXPHU².HHSWKHVHLQVWUXFWLRQVIRU
future reference.
 6NLOOOHYHO²,QVWDOODWLRQRIWKLVDSSOLDQFHUHTXLUHV
basic mechanical skills.
 &RPSOHWLRQWLPH²
Refrigerator Installation
30 minutes
Water Line Installation
30 minutes
 3URSHULQVWDOODWLRQLVWKHUHVSRQVLELOLW\RIWKH
installer.
 3URGXFWIDLOXUHGXHWRLPSURSHULQVWDOODWLRQLVQRW
covered under the Warranty.
If the refrigerator has already been installed, remove
the base grille (see Step 2 in Moving the Refrigerator),
then skip to Step 5 in Installing the Refrigerator.
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: GEAppliances.com
In Canada, call 1.800.561.3344 or Visit our Website at: www.geappliances.ca
Installation
Refrigerator
Instructions
Models 22, 23, 25, 26, 27 & 29
If the refrigerator has an icemaker, it will have to be
connected to a cold water line. A GE water supply
kit (containing tubing, shutoff valve, fittings and
instructions) is available at extra cost from your
dealer, by visiting our Website at GEAppliances.
com (in Canada at www.geappliances.ca) or from
Parts and Accessories, 800.626.2002 (in Canada
1.800.661.1616).
PREPARATION
WATER SUPPLY TO THE ICEMAKER
TOOLS YOU WILL NEED
Phillips Head Screwdriver
3/8” and 5/16” Socket 1/2” and 7/16” Wrench
Plastic Putty Knife
Loading ...
Loading ...
Loading ...