LG UBN24R Ducted System - Slim Ducted 6.8kw Cooling

OWNER’S MANUAL - Page 15

For UBN24R.

PDF File Manual, 56 pages, Read Online | Download pdf file

UBN24R photo
Loading ...
Loading ...
Loading ...
THE INDOOR UNIT INSTALLATION
15
ENGLISH
CAUTION
!
• This air-conditioner uses a drain pump.
Install the unit horizontally using a level
gauge.
• During the installation, care should be
taken not to damage electric wires.
- Select and mark the position for fixing bolts and
piping hole.
- Decide the position for fixing bolts slightly tilted to
the drain direction after considering the direction
of drain hose.
- Drill the hole for anchor bolt on the wall.
NOTE
!
Avoid the following installation location.
1 Such places as restaurants and kitchen where
considerable amount of oil steam and flour is
generated. These may cause heat exchange
efficiency reduction, or water drops, drain
pump mal-function. In these cases, take the
following actions;
- Make sure that ventilation fan is enough to
cover all noxious gases from this place.
- Ensure enough distance from the cooking
room to install the air conditioner in such a
place where it may not suck oily steam.
2 Avoid installng air conditioner in such places
where cooking oil or iron powder is generated.
3 Avoid places where inflammable gas is
generated.
4 Avoid place where noxious gas is generated.
5 Avoid places near high frequency generators.
Cooking table
Air conditioner
Take enough
distance
Use the ventilation fan for smoke-collecting
hood with sufficient capacity.
Level gauge
Ceiling
Ceiling board
Unit:mm
875(Ceiling opening)
Panel size : 950 X 950 mm
Panel size : 700 X 700 mm
787
684
671
875 (Ceiling opening)
840
840
[TM/TN/TP Chassis] (Unit : mm)
[TQ/TR Chassis] (Unit : mm)
585~660(Ceiling opening)
517
461
517
585~660(Ceiling opening)
523
570
570
319
Unit:mm
Panel size : 620 X 620 mm
600(Ceiling opening)
517
461
517
600(Ceiling opening)
523
570
570
319
THE INDOOR UNIT INSTALLATION
Position of Suspension Bolt
Ceiling Cassette Type
Loading ...
Loading ...
Loading ...