Loading ...
Loading ...
Loading ...
16
BEFORE YOU BEGIN
Read these instructions completely
and carefully.
IMPORTANT Save these
instructions for local inspector’s use.
IMPORTANT Observe all
governing codes and ordinances.
Note to Installer – Be sure to leave these
instructions with the Consumer.
Note to Consumer – Keep these
instructions for future reference.
Skill level – Installation of this appliance
requires basic mechanical skills.
Completion time – Refrigerator Installation
30 minutes
Water Line Installation
30 minutes
Proper installation is the responsibility of
the installer.
Product failure due to improper installation
is not covered under the Warranty.
If the refrigerator has already been installed,
remove the base grille (see Step 2 in
Moving
the Refrigerator
), then skip to Step 5 in
Installing the Refrigerator
.
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com
In Canada, call 1.800.561.3344 or Visit our Website at: www.geappliances.ca
Installation
Refrigerator
Instructions
Models 25 & 27
If the refrigerator has an icemaker, it will have
to be connected to a cold water line. A GE
water supply kit (containing tubing, shutoff
valve, fittings and instructions) is available
at extra cost from your dealer, by visiting
our Website at ge.com (in Canada at
www.geappliances.ca) or from Parts and
Accessories, 800.626.2002 (in Canada
1.800.661.1616).
PREPARATION
WATER SUPPLY TO THE ICEMAKER
TOOLS YOU WILL NEED
Phillips Head Screwdriver
3/8 and 5/16 Socket 1/2 and 7/16 Wrench
Plastic Putty Knife
Loading ...
Loading ...
Loading ...