Loading ...
Loading ...
Loading ...
Preparing the Unit for Use
Setup
1. Position the machine so there is a minimum of 8" clearance for the back and sides. The
front of the unit should be positioned for maximum discharge distance or directly to a spe-
cific location for spot dry. If the compressor didn't remain vertical during transportation, wait
a minimum of 30 minutes before turning the unit on.
2. The included drain line attaches to the unit via a quick connection fitting that is located on
the base of the unit. The drain line should be routed to a suitable drain or outside. Since the
unit has an integral drain pump, the drain line may go up vertically (no more than 15') prior
to reaching the final drain location.
Quick Connection to Drain Tube
Quick Connect Fitting
9
When the compressor is started, if the coil temperature value detected is greater than or equal to
(ambient temperature -3 degrees) for 30 minutes continuously, it is judged to be fluorine deficient
(except defrosting), E5 is displayed, and the machine cannot be stopped for operation
(it needs to be powered up again after troubleshooting). After the power is back on, the machine
runs continuously for another 30 minutes for judgment.(the temperature probe is broken, the
temperature needs to be minimal). The pump button can be operated.
After the pump works for 28 seconds when the high water level is switched on, E4 fault is judged when
the high water level switch is switched on for 3 consecutive seconds, and E4 fault is displayed. The
machine stops and cannot be operated (the pump needs to be powered up again after troubleshooting).
The pump can be operated.
Loading ...
Loading ...
Loading ...