BMW 2012 M6 Convertible Car

User Manual - Page 248

For 2012 M6 CONVERTIBLE.

PDF File Manual, 297 pages, Read Online | Download pdf file

2012 M6 CONVERTIBLE photo
Loading ...
Loading ...
Loading ...
4. Insert the sealant bottle on the compressor
housing in an upright position.
5. Screw the filling hose of the sealant bottle
onto the valve of the defective wheel.
6. With the compressor switched off, insert the
plug into the power socket inside the vehi‐
cle.
7. With the ignition turned on or the engine
running, switch on the compressor.
Let the compressor run for approx. 3 to 8 mi‐
nutes to fill the tire with sealant and achieve a
tire inflation pressure of approx. 2.5 bar.
While the tire is being filled with sealant, the in‐
flation pressure may sporadically reach approx.
5 bar. Do not switch off the compressor in this
phase.
Enclosed areas
Do not let the engine run in enclosed
areas; otherwise, breathing of exhaust fumes
may lead to loss of consciousness and death.
The exhaust gases contain carbon monoxide, an
odorless and colorless but highly toxic gas.◀
Switch off the compressor after 10 mi‐
nutes
Do not allow the compressor to run longer than
10 minutes; otherwise, the device will overheat
and may be damaged.◀
If a tire pressure of 2 bar is not reached:
1.
Switch off the compressor.
2. Unscrew the filling hose from the wheel.
3. Drive forward and back to distribute the
sealant in the tire.
4. Inflate the tire again using the compressor.
If an inflation pressure of 2 bar cannot be
reached, contact your service center.
Seite 248
Mobility Wheels and tires
248
Online Edition for Part no. 01 40 2 900 735 - 03 12 490
Loading ...
Loading ...
Loading ...