User Manual - Page 8

For VDD5480SS. Also, The document are for others Viking models: VDD5300, VDD5360, VDD5450, VDD5480

Loading ...
Loading ...
Loading ...
8
INSTALL ELECTRICAL WIRING
1. Mount a standard wiring box, with 3-pronged receptacle,
within reach of the downdraft's power cord.
2. Run appropriate power cable and connect it to receptacle.
3. Connect blower wires to wires in wiring box. Black to black,
white to white, blue to blue, orange to orange, gray to red,
and green to ground screw.
4. Replace wiring box cover.
5. Plug ELECTRICAL PANEL CABLE into RECEPTACLE at
bottom/right of downdraft housing.
6. Plug the downdraft's power cord into the outlet. Make sure
that the power cord is routed away from the heat generated
by the cooktop.
CAUTION: All electrical wiring should be done by a
qualied person(s) in accordance with all applicable
codes and standards.
1. Mount a standard wiring box, with 3-pronged receptacle,
within reach of the downdraft's power cord.
2. Run appropriate power cable into cabinet and connect it to
electrical box and receptacle.
3. These exterior or in-line blower can be used:
Models VDVE900, VDVE1200 - Exterior
120 VAC • 60 Hz • 6.0 A (max.)
CAUTION: All electrical wiring should be done by a
qualied person(s) in accordance with all applicable
codes and standards.
Installations using FLEX BLOWER only:
Installations using REMOTE BLOWER only:
4. Run 2-wire plus ground power cable from the exterior or in-
line blower to wiring box on adaptor plate. Remove WIRING
BOX COVER.
5. Connect blower wires to power cable from exterior or in-line
blower. Black to black, white to white, and green to ground
screw.
6. Replace wiring box cover.
7. Plug ELECTRICAL PANEL CABLE into RECEPTACLE at
bottom/right of downdraft housing.
8. Plug the downdraft's power cord into the outlet. Make sure
that the power cord is routed away from the heat generated
by the cooktop.
INSTALL DUCTWORK
1. Cut hole in cabinet as well as holes in wall or oor as necessary.
2. Mount the roof or wall cap and work back towards the cabinet,
attaching all ductwork, elbows and transitions as previously
planned. Tape all ductwork connections to make them secure
and air tight.
3. Connect ductwork (and transition, if required) to down-
draft.
CAUTION: Before cutting hole in cabinet for
ductwork, check for interference with oor joists,
wall studs, electrical wiring, or plumbing.
WIRING BOX COVER
RECEPTACLE
ELECTRICAL
PANEL CABLE
CABINET BOTTOM
Loading ...
Loading ...
Loading ...