Loading ...
Loading ...
Loading ...
16
SUBSEQUENT TRANSPORT
MOVING AND TRANSPORT
349780
After each drying certain amount of condensed water is retained
in the appliance. Switch on the appliance and choose one of the
programs, then let the appliance operate for approximately half
a minute. This will pump out the remaining water and prevent
damage to the dryer during transport.
After transport, the dryer should be left to stand still for at
least two hours before it is connected to the power mains to
allow the system to stabilize. We recommend that installation
and connection should be done by a qualified person.
If the appliance was not transported in compliance with the
instructions, the dryer should be left to stand still at least two
hours before it is reconnected to the power mains.
Before connecting the appliance, read the instructions for
use. Repair or any warranty claim resulting from incorrect
connection or use of the appliance shall not be covered by the
warranty.
The belt can be replaced by a servising engineer only, who
incorporates an original spare part with the marking OPTIBELT
EPH 1906, code 104265, OPTIBELT 8 EPH 1941, code 160165
(depending on model).
Loading ...
Loading ...
Loading ...