GE AJCS12DCAM1 - 230/208 Volt "J Series" Built-In Room Air Cool Unit

User Manual - Page 19

For AJCS12DCAM1. Also, The document are for others GE - General Electric models: AJCH 08/10 ACB, AJCH 10/12 DCB, AJCQ 06 LCB, AJCQ 08/10 ACB, AJCQ 10/12 DCB, AJCS 06 LCB, AJCS 08/10 ACB, AJCS 09/10/12 DCB, AJEH 12 DCB, AJES 06 LSB, AJES 08 ASB, AJES 09/10/12 DCB, AJES 10 DSB, AJHS 08 ASB, AJHS 08/10 DCB

PDF File Manual, 76 pages, Read Online | Download pdf file

AJCS12DCAM1 photo
Loading ...
Loading ...
Loading ...
Installation Instructions
19
MEASURE, CUT AND INSTALL
FILLER PANELS
Measure from the edge of the panel marks
(see Prepare the Window) to the inside of
the window track on each side. (A and B)
Mark the A and B measurements on each
side of the filler panel board. Cut the panels
and discard the center piece. Note position
of the notches.
Put together the panel assemblies. Remove
the paper backing from the case side gasket
and attach it to the angle. Push a pencil point
through the gaskets to locate the holes in
the angles.
Install the panels in the window. Place the spring
clips 3 from the top and the bottom. Squeeze
and push the clips to fit in the window track and
the tab into the sill support.
6
A
B
C
D
Sill
A
Window track
Width of the air
conditioner
(panel marks)
Left side
B
Right side
13
3
8 13
3
8
Filler
Panels
Cut
panels
and
discard
center
piece
B
Right
side
A
Left
side
(holes are on the left)
(holes are on the right)
Gasket
Gasket
Angle
Panel
Tab
Type C
(painted
screws)
Angle
Hook the tab into
the sill support
3
Loading ...
Loading ...
Loading ...