Loading ...
Loading ...
Loading ...
Site Selections and Preparation
This section provides instructions for selecting a location and preparing the site to install the Log
Grate
1. Select a suitable location that ensures the Log Grate is sitting on a hard level surface for
optimum ame effect
2. Allow for approximately 5cm of clearance behing the unit ( from the frame to the back of the
mantle) and 20cm directly above the back log to allow for removal of the Rell Container.
3. Carefully unpack all of the components from the box.
Caution: Handle the logs carefully, that are fragile and can easily crack or break if dropped.
4
1
3
2
4
5
6
7
Loading ...
Loading ...
Loading ...