Loading ...
Loading ...
Loading ...
16
Installation Instructions
Gas connection
All connections must be wrench-tightened
Flare
Union
Flare
Union
Manual
Shutoff
Valve
Closed
Open
Flexible
Connector
GAS FLOW
Inlet Pipe on
Back of Dryer
Nipple
1. Remove the shipping cap from gas
pipe at the rear of the dryer.
2. Connect a 1/2 inch (1.27 cm) I.D.
semi-rigid or approved pipe from
gas supply line to the 3/8 inch (0.96
cm) pipe located on the back of the
dryer. Use a 1/2 inch to 3/8 inch
(1.27 cm to 0.96 cm) reducer for the
connection. Apply an approved thread
sealer that is resistant to the corrosive
action of liqueed gases on all pipe
connections.
IMPORTANT
DO NOT connect the dryer to L.P. gas
service without converting the gas valve.
An L.P. conversion kit must be installed
by a qualied gas technician.
IMPORTANT
The supply line must be equipped with
an approved manual shuto valve. This
valve should be located in the same
room as the dryer and should be in a
location that allows ease of opening
and closing. DO NOT block access to
the gas shuto valve.
3. Open the shuto valve in the gas
supply line to allow gas to ow
through the pipe. Wait a few minutes
for gas to move through the gas line.
4. Check for gas system leaks with a
manometer. If a manometer is not
available, test all connections by
brushing on a soapy water solution.
Shutoff Valve - Open position
to dryer
from gas supply
WARNING
EXOLOSION HAZARD
NEVER test for gas leaks with an open
ame.
Loading ...
Loading ...
Loading ...