Loading ...
Loading ...
Loading ...
channel.
2. Use a
drill bit to drill a starter hole through
the top hole in the side curtain and into the
window sash.
3. Insert one of the
screws through the top
hole of the lefthand curtain and into the
window sash.
4. Repeat for the right-hand curtain.
Attach Side Curtains to Window
Top View
Bottom View
5. Use a
drill bit to drill a starter hole through
the bottom hole in the side curtain and into
the window frame.
6. Insert one of the
screws through the
bottom hole of the left-hand curtain and into
the window frame.
7. Repeat for the right-hand curtain.
Completing the Installation
A
B
1. Insert the foam seal behind the top of the
lower window sash and against the glass of
the upper window.
A. Top of lower window sash
B. Foam seal
B
A
2. Place the window lock bracket as shown. Use a
drill bit to drill a starter hole through the hole
in the window lock bracket and into the upper
window.
3. Attach the window lock bracket to the upper
window with one
screw to secure the
window in place.
4. After installation is complete, check that the
unit is tilting downward toward the outside,
for proper condensate drainage.Plug into a
grounded 3 prong outlet.
5. Press RESET on the power supply cord.
See “Electrical Requirements.”
Loading ...
Loading ...
Loading ...