Loading ...
Loading ...
Loading ...
12 Room Air Conditioner
Installation
UNIT INSTALLATION
1. Remove the shipping screw from the ventilation door.
2. Remove the front gille by pulling it out at the bottom
to release it, then lift it up along the unit top front.
6. Slide the unit into the wall sleeve and secure with
4 screws through the unit flange holes.
3. Remove cover by removing 3 screws from front.
7. Reinstall the front grille by hooking the top over the
unit top, then pushing it in at the bottom.
4. Connect accessory power supply cord, and fix power
cord to basepan with screws.
5. Replace cover with screws. Tighten securely.
ELECTRIC HEATER RATING
(CONFIGURATION BASED ON POWER CORD)
POWER CORD
AYUH2115 2 400/2 300 W
230/208
230/208
3 300/3 200 W
230/208
15 A
20 A
30 A4 700/4 600 W
AYUH2120
AYUH2130
VOLTAGE
WATTS
HEATER
CURRENT
HEATER MAX.
FUSE SIZE
MIN.CIRCUIT
AMPACITY
14.5 A
19.8 A
28.3 A
10.5/11.2 A
14.5/15.5 A
20.6/22.3 A
Loading ...
Loading ...
Loading ...