Rheem 491250G7BL 250L 3.6KW Electric Hot Water System

User Manual - Page 29

For 491250G7BL.

PDF File Manual, 40 pages, Read Online | Download pdf file

491250G7BL photo
Loading ...
Loading ...
Loading ...
29
CONNECTIONS PLUMBING
All plumbing work must be carried out by a qualified person and in accordance
with the Standard AS/NZS 3500.4 and all local codes and regulatory authority
requirements. In New Zealand the installation must also conform to the New
Zealand Building Code.
CONNECTION SIZES
Rheem 49 series
Hot water connection:
Rp 3/4
Cold water connection:
Rp 3/4
Relief valve connection:
Rp 1/2
WATER INLET AND OUTLET
Rheem 49 series 250 to 400 models have dual handed cold and hot water
connections. The water connections can be made to either side.
All pipe work must be cleared of foreign matter before connection and purged
before attempting to operate the water heater. All olive compression fittings must
use brass or copper olives. Use an approved thread sealant such as Teflon tape
on all other threaded joints.
An isolation valve and non-return
valve must be installed on the cold
water line to the water heater. An
acceptable arrangement is shown in
the diagram. Refer also to “Hot
Water Delivery” on page 23 and to
“Mains Water Supply” on page 22.
A disconnection union must always
be provided at the cold water inlet
and hot water outlet on the water
heater to allow for disconnection of
the water heater.
This water heater has either a plastic dip tube or
fitting liner in the inlet and outlet fittings (see
diagram). These must be in place for the water
heater to function properly. Do not remove or
damage them by using heat nearby. They will be
pushed into the correct position as the fitting is
screwed in.
Loading ...
Loading ...
Loading ...