Loading ...
Loading ...
Loading ...
LEH CARE & USE/INSTALLATION
|
7
11/32" OUTSIDE NUT
11/32" INSIDE NUT
(SNUG TO CERAMIC)
Disconnect the power at the breaker. Remove the grill by grasping it in the middle, flex grill up and lift it off.
Unscrew and remove both end reflectors. Unhook element clips at each end of the heater and remove nuts from
end of element to remove the existing quartz tube. Carefully install the new element. Remove one nut from end of
the new element. Install wire by sliding high temperature ring terminal onto element screw and replace nut. Use a
thin 11/32" wrench to hold inside nut. Nuts must make a tight connection. Close element clips over tube, reinstall
end reflectors, then snap protective grill back in place.
NOTE: Hold ceramic element firmly while
tightening nut to prevent damage to
element. Nut should be tightened snug.
A loose connection can cause the
element to short or fail prematurely.
REPLACEMENT ELEMENTS
PART NUMBER ELEMENT NUMBER LENGTH WATTS VOLTS FITS
LERE2024 E-2024 36" (0.9m) 2000 240 LEH39
LERE3024 E-3024 58" (1.5m) 3000 240 LEH61
PART NUMBER PART DESCRIPTION QUANTITY NEEDED
36523 Dual Element End Reflector (Set of 2) 1
36525 Body Reflector – Fits 39" (1.0m) 1
36526 Body Reflector – Fits 61-1/4" (1.6m) 1
36528 Grill Guard – Fits 39" (1.0m) 1
36529 Grill Guard – Fits 61-1/4" (1.6m) 1
36531 Lead Wire Set – Fits 39" (1.0m)* 2
36532 Lead Wire Set – Fits 61-1/4" (1.6m)* 2
36533 SS Mounting Bracket (Set of 2) 1
FMKIT39 Flush Mount SS Plaster Frame – Fits 39" (1.0m) 1
FMKIT61 Flush Mount SS Plaster Frame – Fits 61-1/4" (1.6m) 1
* Note: Dual Element Heaters require 2 Lead Wire Sets per Heater
REPLACEMENT ELEMENT INSTALLATION
REPLACEMENT PARTS (see diagram on page 12)
Loading ...
Loading ...
Loading ...