Globe C36CBSR C36CB-SR Chefmate 36" Gas Charbroiler with 3 Burners, up to 105,000 BTUs, Stainless Steel Radiants and LP Conversion Kit in Stainless Steel

User Manual - Page 2

For C36CBSR.

PDF File Manual, 4 pages, Download pdf file

Loading ...
Rev. A O:\Service\Public\service bulletins\999241-1 Gas Conversion Charbroiler
Charbroiler
Conversion Kit Instructions
Do not attempt gas conversion by yourself. Gas conversion of your unit is to be
made by a certied/licensed technician. Locate an authorized Globe servicer at
www.globeslicers.com
CONVERSION
Instructions are for conversion from Natural Gas to Propane (L.P.) on all models. The conversion should be
done before connecting the unit to the gas supply. Units are shipped from the factory equipped for use on
natural gas. Parts necessary for L.P. (liquid propane) are provided with the unit. Turn off the main gas supply
before doing any maintenance.
1. Remove the knobs and front panel.
2. Unscrew bolts and pilot valve, then
remove the manifold.
3. Replace the orice ttings into the valve.
Note: Unit Number on side of orice
ttings.
4. Replace the front panel and knobs
NAT
L.P.
5. Before installing the included convertible
regulator, unscrew the octagon cap. You can read
(NAT) on the plastic insert attached to the head of
the cap; ip it over and snap back in place.
Convertible
regulator with
octagon cap.
Unscrew from
regulator.
Pictured is
the plastic
insert. Pull
off insert
from octagon
cap and
reverse the
plastic insert
position so
that the L.P.
position is
attached to
the octagon
cap head.
L.P. Position
of insert.
Regulator
is now
converted to
L.P.
6. Continue with installation.
L.P.
L.P. Position
Pg 2 of 4
CAUTION FOR SERVICERS: If you convert from one gas type to another, please adjust to the correct gas
pressure before use. Also, be sure to indicate the correct gas markings on all equipment tags/labels.
Loading ...
Loading ...