Loading ...
Loading ...
Loading ...
8
newair.com
WALL/CEILING MOUNTING INSTRUCTIONS
Tools needed:
Power drill
4mm or 5/32in drill bit
Phillips head screwdriver
Stud finder
Remove Heater and all packing material from the box, being careful to remove
all Styrofoam from the heater itself before use.
1. Line up both holes on the bracket with the adjacent holes on the heater
handle.
2. Attach heater handle to bracket with 20mm screw and nut, 10mm washer,
and locking washer.
3. Locate a wood stud in a wall or a joist in the ceiling to mount the heater.
4. Use the holes in the bracket to mark 2 holes for drilling.
5. Pre-Drill 2 holes for screws using a drill bit.
6. Secure two 65mm screws to wall stud/ceiling joist leaving 1/8” exposed.
Two (2) screws must be attached securely to a wood stud (min 1.5”) in
order for the heater to remain safely mounted.
7. Attach the bracket to the exposed screw head by sliding through keyholes
on the bracket and pushing down to lock the bracket into place.
8. Tighten screws against bracket to secure.
CAUTION: HEATER MUST BE ATTACHED TO A JOIST WITH MINIMUM OF (2)
SCREWS IN OPPOSING HOLES.
CAUTION: USE APPROPRIATE FASTENERS. THE SCREWS INCLUDED ARE FOR
INSTALLING IN WOOD STUDS ONLY AND ARE NOT INTENDED FOR METAL
JOISTS.
CAUTION: BE CERTAIN ADJUSTMENT SCREWS ARE TIGHTENED FIRMLY TO
SECURE HEATER TO BRACKET.
CAUTION: Read carefully and keep all instructions and warnings before
installation and use. Failure to follow these instructions may result in a possible
electric shock, injury to persons or fire hazard, and will void the warranty.
Loading ...
Loading ...
Loading ...