GE Zoneline AZ55H09EAB Premium Series Heat Pump Unit

Owner’s Manual and Installation Instructions - Page 14

For AZ55H09EAB. Series: Zoneline Premium Series

PDF File Manual, 24 pages, Read Online | Download pdf file

AZ55H09EAB photo
Loading ...
Loading ...
Loading ...
Installation Instructions
14
HOW TO CONNECT
1 Remove the room cabinet.
2 Connect to electrical power.
3 See the special instructions below for applicable
supply voltages.
4 Reinstall the room cabinet.
230/208 VOLT
ELECTRICAL SUPPLY
Tandem
15 Amp.
230/208 volt receptacle configuration.
Perpendicular
20 Amp.
Large Tandem
30 Amp.
Order Kit RAK4002 for 230/208 volt direct
connection.
230/208 volt models may be installed using one of
the following electrical subbases:
Electrical subbases provide a flexible enclosure for
direct connection or enclosed receptacles.
The instructions provided with the selected subbase
kit must be carefully followed. It is the responsibility
of the installer to ensure the connection of
components is done in accordance with these
instructions and all electrical codes.
Branch Circuit and Proper GE
Unit Amperage Rating Subbase Kit
15/20 RAK204D20
30 RAK204D30
A power supply kit must be used to supply power to the
Zoneline unit. The appropriate kit is determined by the
voltage, the means of electrical connection and the
amperage of the branch circuit.
Connections of 208 or 230 volt circuits may be with a
power supply kit or a junction box kit.
All wiring, including installation of the receptacle,
must be in accordance with the NEC and local codes,
ordinances and regulations.
Power supply kit
Loading ...
Loading ...
Loading ...