Loading ...
Loading ...
Loading ...
14
ASSEMBLY
Figure 24
NOTE: Chute control rod will fit snug into pinion gear. Support rear of dash
panel with one hand while inserting rod with your other hand to ensure rod
is inserted all the way into pinion gear.
NOTE: The hole in the chute directional control rod is a reference for aligning
rod with indicator arrow on pinion gear, and will be visible after rod has been
inserted.
7. Push chute control rod toward control panel until hole in rod lines up with
hole in chute control input closest to chute control head and insert hairpin
clip (a)removed in Step 1. See Figure 25.
Figure 25
NOTE: Second hole is used to achieve further engagement of chute control
rod into pinion gear if required. Refer to Service section for Chute Control
Rod adjustments.
8. Finish securing chute control head to chute support bracket with wing nut,
clevis pin, and bow-tie cotter pin (e) removed in Step 1.
STOP
Continue to Set-Up (page 18).
Overhead Chute Control (w/ Flex Shaft & Steel Chute)
Figure 26
1. Remove lock nuts and hex screws from chute support bracket (this will
require two wrenches). See Figure 27.
2. Place chute assembly onto chute base and chute control head onto chute
support bracket. See Figure 27.
Chute
Assembly
Chute Base
Chute
Support
Bracket
Chute Control
Head
Figure 27
Loading ...
Loading ...
Loading ...